Awards

Recognised across construction

Team

A high level of customer service

Peak Training Centre

The world's first carbon neutral training centre

Beresford’s

The largest precast concrete installation specialist in the UK

ALIMATS®

Interlocking Aluminium Crane Mats & Outrigger Pads

Hole Covers

Temporary Safety Hole Covers for Construction

Instant Pipe Shutter

Alternative Shuttering Method

Levelling Shims

Stacker Packers, our engineered levelling shim with a high compressive strength

Pole Driller

Safe, fast and cost-effective drilling

Safety Net Recovery System

Construction’s Fastest Inflatable System

Shutter Clip

Permanent shuttering solution for hollowcore unit ends

SLAPP Clamp

The safe lightweight block moving system

IMG-20220826-WA0028

August 25, 2022

ALIMATS® at Euston Station – our MEWP tracking and operating solution for Premier Modular

ALIMATS® at Euston Station – our MEWP tracking and operating solution for Premier Modular

The enquiry for this Euston Station project came in on the Tuesday, we’d provided a solution by Wednesday and received the order on Friday – all within one week.

This included completing a comprehensive Pre-Qualification Questionnaire (PQQ). Our own team installed the system.

Our drawing below, shows how our ALIMATS® extra-long modules are set-up to accommodate three machines with varying trackwidths. The reason the modules are at an angle is to ensure load spread occurs across the interlock, as it spreads perpendicular to the direction of travel. This will also mitigate any rippling that could occur if the system was installed straight – if the system is rippling then the tracking load is not being spread.

IMG-20220826-WA0015 For the operating loads which are significantly higher than tracking loads we introduced an additional layer, so the system works as outrigger mats. The temporary works design required a minimum 2.01m² and we provided a top layer of modules which provided 2.52m² once installed.This circa 75m track is made up using our 1740mm, 3480mm and 2175mm modules, in all 354 interlocking mats – plus, 164 Ethafoam sheets.Download our Euston Station drawing here.To download some of our other drawings for MEWP tracking and operating systems, click here.Or, to read about our client powered access projects, stay on our news page and scroll through our blogs.

If you’re looking for a MEWP tracking and operating solution, please contact us to find out more.